delivery

hi guys,

i am facing a real time problem,

from plant A to plant B Stock transfer happens. the P>O>item for plant B was 3000tons. but only 2000 tons was delivered.

i have given a new requirement for december. but after running mrp for this month it is giving one planned order for the quantity i.e.. 1000tons which was nt delivered.

it is also showing in md04 delivery -1000. i want a planned order without considering the old delivery dues which will never happen.

please advice.

thanks

sanjeev

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 05, 2007 at 08:11 AM

    Sanjeev,

    Are you taking about the planned order for production at the delivery plant? If so you need to TECO the previous production order used to deliver 2000 tons.

    Regards,

    Prasobh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.