Transport Cube to Production

Hi All,

I did as following :

1. I transport cube : 0BCS_C11 using RSA1 in "Transport Connection".

2. I have already choose grouping = "In data flow before and afterwards".

System take all necessary objects to be transported. I tick the info area, info object (Characteristic and the key figure).

3. When Released the request in SE10, I have checked that the INFO OBJECTs are in the list of transport.

But when I check in the production server. Only the cube was transported. System didn't carry out the INFO OBJECTs.

The questions are :

1. Is this normal?

2. Do i have transported manual the INFO OBJECTs?

Thanks for your info.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 05, 2007 at 08:59 AM

    Hi,

    Why do you think that the infoobjects have not been transported? They may sit under unassigned nodes.

    Check if your cube is OK, all its IOs are green, then everything was transported.

    Hope this helps.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.