Changing to new batch

HI

While doing goods receipt we have taken into wrong batch

I just want to move the material into other batch (might be new one or existing one) in the same plant and same storage location and in the same stock type.

Regards

Reddy

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 05, 2007 at 08:06 AM

    Hi,

    Try with mvmt type 309 in MB1B.

    thanks

    suresh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 05, 2007 at 11:18 AM

    Hi,

    You can either do material to material transfer using movt type 309 in mb1b in the new batch.

    Or you can reverse the goods receipt and then change the batch in the delivery or PO whatever it is and then do the GR again

    Noopur

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.