on 12-05-2007 7:51 AM
HI
While doing goods receipt we have taken into wrong batch
I just want to move the material into other batch (might be new one or existing one) in the same plant and same storage location and in the same stock type.
Regards
Reddy
Hi,
You can either do material to material transfer using movt type 309 in mb1b in the new batch.
Or you can reverse the goods receipt and then change the batch in the delivery or PO whatever it is and then do the GR again
Noopur
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Try with mvmt type 309 in MB1B.
thanks
suresh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
10 | |
10 | |
6 | |
5 | |
5 | |
5 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.