Non Stock Material for Projects

Hi Gurus,

While doing MIGO for non stock material in case of projects (Category Q), system is giving error which says Account Determination not possible.

Please tell me what setting missing in OBYC for projects.

Thank You

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Dec 05, 2007 at 07:01 AM

    Hi,

    Non stock material is consumed during receipt ie Goods receipt is goods issue also and you need not do goods issue seperately. Non stock material cant have category Q as it is Project <i><b>stock</b></i> category. The account assignment should be P.

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.