MRP

HI,

WE HAVE FINISHED PRODUCT HAVING MRP TYPE-PD, COMPONENT HAVING VB , WHEN WE RUN MRP WITH MD02 IT ONLY CREATE REQMT FOR FINISHED PRODUCT,

HOW CAN I GET REQUIREMENT FOR COMP ALSO, IS THERE ANY SETTING.

PL SUGGEST.

Basant

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 10:18 AM

    Hi

    Change MRP Type to PD for comp also if u want planed order qty based on fin prduct reqmt

    Otherwise give more(than stock) reorder point to get the planned order for comp if u use VB as a MRP Type

    Gopi

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      All depends on ur requirements..

      If u want all in one u can run at plant level MD01 for all materials the same can be scheduled in background via MDBT..

      If u want for one material multi level use MD02 and only one level MD03

      I hope u know all these Txns still just a refreshment

      Gopi

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 10:19 AM

    Do you mean to say that MRP has created REQ or Planned order???

    If MRP is not creating any Pl Order for Comps, the reason might be that

    there might be sufficient stock available for these comps.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 10:22 AM

    Hi,

    In your case, depedent requirements will not be created, since Mrp type VB system creates direct procurement proposal whenever component stock falls below the reorder point when u Run MRP for Finished product.

    regards

    pradeep

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 11:02 AM

    Hi Gopi,

    THANX FOR SOLVING MY PROBLEM

    BASANT

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 11:04 AM

    hi all

    as the guys, the vb ( reoder point ) is not taking care about the dep reqmt when there is the sufficient qty, when we going to hav the mrp run,

    Procurement will be triggered only when the stock level falls below the re-order point (indicated in material master). In your case, probably there may be free stock more than the re-order values. Hence, no fresh requirements are genereated.

    pls check

    with thanks

    vraj

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.