Skip to Content
author's profile photo Former Member
Former Member

Use of Parties

Hello all,

I have a scenario with BPM. I receive from SAP an orderresponse this goes trough my BPM and finally a receiver must be exterminated. I do not want to do this within my BPM, so I do not want to uses branches with a condition. Otherwise I need to adjust my BPM every time a new party comes in and this makes the BPM slow. (I am talking about 30 parties).

So in what other way can I determine the party?

Thnx for the help.

Guido

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 12:00 PM

    Have you tried looking at Enhanced Receiver Determination ?

    http://help.sap.com/saphelp_nw04/helpdata/en/43/a5f2066340332de10000000a11466f/frameset.htm

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.