Hi

I have made chanegs to BADI method. I have activated the method.

In this method AFTER_CHANGE_STATUS when the status of a document it changed from IW to QC and if there is not material link exits to the document it should display an error message. but when i try to do so in CV02N it allows me to change the status with out giving error. Plz let me when a BADI methid is changed what all things need to be activated.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 06:20 AM

    hello

    when u create a BADI plaese check all things are actived are not the only thing i can say .becoz u know the process.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 06:31 AM

    Hey what ever you did it correct. Try to check in debugging what is happening in BADI. that will solve the problem.

    for more details on BADI.. check the link...

    http://saptechnical.com/Tutorials/ExitsBADIs/ExitsMain.htm

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.