Can any one can explain how to use MMPI and in which case we use this T-code?

Thanks and Regards,

Surendra babu.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 06:01 AM

    This tcode is used to open the next posting period in MM. you have to give the Company code in from & two field then define which period is going to start with fiscal year or either define the first date of the coming period like 01.12.2007 use any one of both mentioned above.

    Regards,

    Meenakshi

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 06:45 AM

    Hi,

    This program must be viewed in conjunction with the period closing program (RMMMPERI). It does the following:

    Sets the current period

    However, do not use this program to set the new period at the end of a period, and use it only in addition to the period closing program, never instead of it.

    Creates or updates the control record

    Makes it possible to create material master records if you are initializing a company code for the first time

    However, to initialize company codes, you are recommended using the IMG activity Maintain company codes for materials management instead of this program.

    You can also use this program to correct data inconsistencies, for example, due to user errors when running the period closing program, or that occur as a result of skipping several periods in a test system. However, first make sure you understand why the inconsistency arose and then decide whether running this program is the correct way of resolving it.

    Caution

    Be careful if the period used for initialization precedes the current period in the control record for the company code since this can result in an inconsistency between goods movements and material master segments. This is because the stock information in the material master segments is assigned to the new current period in this case (see the following example).

    Example

    Current period 02

    Opening stock balance 0 pieces

    Goods receipt 10 pieces

    Period used for initialization 01

    According to the material master segment, there are 10 pieces in stock in period 01, although 10 pieces were posted to stock in period 02 according to the goods movement document.

    Requirements

    Be sure you are fully aware what this program does before running it.

    The material ledger must not be activated.

    To run this program in background mode, you must have created a selection variant for it.

    Output

    This program issues a log indicating whether the company code(s) were initialized successfully.

    Best Regards

    Ashish Jain

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.