We have several operating costs accounts that require a mandatory entry in the project code field (could be various codes) is there any way of forcing this when processing? eg option on the chart of account "account details" tab, a field with a tick box for 'project codes mandatory'. If selected and the user tries to save a document to this GL a system message appears advising "GL requires project codes" or something similar?

thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 07:39 AM

    Create user field that mandotary field and set userfield as formatted search for GL field but this case message but display 'user field is require field'

    Or use sdk and coding for validate data

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi thanks but i have decided to set the default project code to REQUIRED so when the user posts to these GL's they are reminded to change the code to the appropriate code. they can run the transaction report by projects to identify any transactions that have not been changed from REQUIRED

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.