discontinuation data in BOM and MAterial master

Former Member
0 Kudos

Dear all

pl. tell how to maintain data for parallel discontinuation.

thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Raj..,

1. When you want to replace a group of materials by material you will use this.

2. in the mrp4 view the materials which you want to replace put Discon ind "1" and the remaining materials in the group "3". and give the followup material name.

3. In the Bom select the material to replace and select (F7). in the basic data tab click "Discontin. Data". give the Dis cont grup and follo up grup.

regards.

Former Member
0 Kudos

hi vee harji,

can you expalin me difference between single/parallel discon. 1 and dependent parallel discont. part/material. can you plz explain the concept even in breif also.

thanks in advance.

Robert.