Skip to Content
author's profile photo Former Member
Former Member

job scheduling to pickup file from source

hi all,

in my requirement "i want to pickup file between at 8pm and 8.30pm from source everyday".

how is it posible.where can i find "time and date " data elements.

shall we write hard code program for it.

--vijay.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

5 Answers

  • Posted on Dec 03, 2007 at 12:48 PM

    check these for cheduling adapters:

    /people/shabarish.vijayakumar/blog/2006/11/26/adapter-scheduling--hail-sp-19-

    /people/alexander.bundschuh/blog/2006/01/04/scheduling-messages-in-sap-xi

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 03, 2007 at 12:50 PM

    Hi,

    You can schedule the communication channel in the Comm Channel Monitor.

    Refer to the SAP Help for more details: Planning" target="_blank">http://help.sap.com/saphelp_nw04/helpdata/en/45/06bd029da31122e10000000a11466f/frameset.htm">Planning Availability Times

    Regards

    Manish

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 03, 2007 at 12:52 PM

    Hi Vijay,

    read this doc:

    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/d458a870-0601-0010-caab-b99c79741964

    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/4f61fddf-0601-0010-7ab5-fb749538f6ab

    Use this blog for scheduling messages in XI

    /people/alexander.bundschuh/blog/2006/01/04/scheduling-messages-in-sap-xi

    Scheduling messages

    /people/shabarish.vijayakumar/blog/2006/11/26/adapter-scheduling--hail-sp-19-

    Thanks

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 03, 2007 at 01:19 PM

    Hi Vijay,

    Activate and deactivate the Communication channels as per the usage and timings in RWB...(almost similar to scheduling the adapter).

    Regards,

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 03, 2007 at 02:33 PM

    Hi Vijay.

    SP19 offers you a way to schedule the file adapters as per your requirements.

    If you are using SP19, try this blog.

    /people/shabarish.vijayakumar/blog/2006/11/26/adapter-scheduling--hail-sp-19-

    Else, try these

    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/d458a870-0601-0010-caab-b99c79741964

    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/4f61fddf-0601-0010-7ab5-fb749538f6ab

    Regards,

    Hari.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.