Skip to Content
author's profile photo Former Member
Former Member

Quality inspection plan --- problem

Hi all,

i have one question for qualilty module regarding inspection plan creation

we have following scinario

transaction code:qp01

enter following data in fields

create insp plan screen will appear

enter following data

material:

plant:

group:

key date:

go to header screen

crate inspection plan screen will get opened

enter following data in gen data fields

usage:

status:

planner group:

from lot size:

inspection plan is generated

we select inspection plan line and go to operation overview

enter following data in operation (routing)screen

op0010:

plant :default

control key:

work center:

operation des:

unit of measurement

add two operation simillarly

go to next screen

inspection plan create :opeation overview screen will be displayed

following fields are blind

operation :

work center:plant:

control key:

standard text key:

for external processing key file

item ouline aggrement field found mandatory

also vendor,insp type,fields found mandatory

after updating data for same following error observed

Message no. 06387

????AGGREMENT ITEMS CONTAINS DIFFERENT MATERIAL??//

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Dec 03, 2007 at 12:57 PM

    Hi all,

    i have one question for qualilty module regarding inspection plan creation

    we have following scinario

    transaction code:qp01

    enter following data in fields

    create insp plan screen will appear

    enter following data

    material:<u>XXXX</u>

    plant:<u>YYYY</u>

    group:<u>EEE</u>

    key date:<u>01.01.2000</u>

    go to header screen

    crate inspection plan screen will get opened

    enter following data in gen data fields

    usage:<u>05</u>-Recipt inspection

    status:<u>04</u>

    planner group:not necessary

    from lot size:<u>1</u>

    <u>Go to Operation tab</u>

    we select inspection plan line and go to operation overview

    enter following data in operation (routing)screen

    op0010:f<u>fffff</u>

    plant :default

    control key:<u>qm01</u>

    work center:<u>not necessary</u>

    operation des:<u>ggggg</u>

    By Selecting operations Row

    Then go to Inspection Char Tab

    Select the Requred Master Inspection Char By Drop Down

    Then Go To ceck tab

    Save the Inspection plan

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.