Hi gurus,

I have a problem. When I change some event in IT 2011 (Time Events), it is not updated in PT60.

I mean, I update for example 30.11.2007, then I run time evaluation. Then, is changed the PT20 in IT2011, and I run again time evaluation, but, still been read the original PT20, even when this PT20 was deleted.

How can I get update of this (IT2011) in a retroactive way?

Please......

Ruben.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Dec 03, 2007 at 12:34 PM

    Whenever you do changes in 2011 and followed by PT60 run, the system will do a retroactive run .

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.