hello in the case of PO and with item cat L
ie its a subcontractiong ie some material havs to go and some mateiral has to come
both should have material number may be sam or diffrent.
if this is ok then there is no neet to have BOM
u will have to manually put the outgoing material in PO in item tab click on componunt and then put the outgoing mateiral manualy and qty required
thus u can creat a PO for L with out bom
but its neceassry to have a outging and incoming material then only its a L type of po
hope things r clear
Reward to get better ans