when doing goods inward getting
error: profit centrer xxx doesnt exist for 3.12.2007.
we assigned prifit centre in material but showing error with other proft center doesnt exist.
plz give me solution urgent,
advance thanks,
reddy
Hi
The Profit center you are using may not be valid on that date.
Check the Vlaidity period of the Profit center in KE53.
If the date 03.12.2007 does not fall in the Validity period,Create the Profit center again in that Validity period including this date. in KE51
Thanks & Regards
Kishore
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
In config you need to check the Cost center setting.
better you have a talk with FI people , they can look in to this matter,
Best regards
Ram
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Pl check in KE52 analysis area for profit center and change if required.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.