Skip to Content
author's profile photo Former Member
Former Member

FI requirements for new plant creation

Dear all,

My cusomer wants to extend the plants from one company code to another company code.

Regarding this, Can any one let me know the requirements need to be done from the FI perspective including all settings and assignments.

Points will be awarded for ur information.

Regards,

Manu.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Dec 03, 2007 at 10:30 AM

    Hi Manoj,

    I don't think there is anything to do with FI perspctive. But if there is any validation with that plant you have to change those thing e.g. business area.

    If you find teh answer is useful to you please assign the points.

    Regards,

    Reva

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.