Good afternoon,

I know by using BADI MD_MRP_PARAMETERS it is possible to modify the PDT maintained in the material master which is considered by MRP (and therefore, influence the creation of purchase requisitions).

However, in our case we use the PDT maintained in the PIR to calculate the lead time of the purchase requisitions so, modifying the PDT in the BADI does not have any effect, as it is not considered later on if the system is setup to consider the values from the PIR.

How anyone faced a similar requirement before? Do you happen to know at which moment during the MRP execution the PDT from the PIR is read?

Thanks a lot,

Lorea

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

avatar image
Former Member Oct 26, 2017 at 01:59 PM
0

No one has faced a similar requirement?

Thanks!