Skip to Content
author's profile photo Former Member
Former Member

Availability Check against PIRs

Hello

In SG 50 & 60, availability check is carried out against PIRs ( Availability check can be carried out in terms of ATP or PIRs . In availability check against PIRs, the system does not take warehouse stock, open receipts into consideration. A check is made against open PIRs to determine where open PIRs can meets the customers requirements. In this check the system takes the consumption mode into consideration )

I looked into the tcodes OPPS & OVZG for requirements class 060 (SG 60: Planning with planning material) requirement class 045 ( SG 50: Planning without

final assembly) to see the configuration settings for availability check

I am not able to see availabilty check against PIRs in the respective ( In fact <b>Availability check check box is not checked</b> in both the strategy groups)

Where can I find configuration settings for the <b>availability check again PIRs for the strategy groups 50 & 60 ( please explain in terms of Tcodes)</b>

Thank you

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Dec 03, 2007 at 02:39 AM

    Hi

    Pl follow the below path to set check against availability Check against PIRs.

    You know that some T>code in Customzation are as SPRO only , so i am giving the excat path for the same..

    SAP Customizing Implementation Guide>>Production >>Production Planning >>Demand Management>>Planned Independent Requirements>>Planning Strategy>>Define Strategy

    Now double click on your required Planning strategy and activate the check for "Availability check"...

    <b>PS:

    SD availability check</b><i>You must carry out an availability check for the corresponding transaction. If the indicator is not set and if the assignment of independent requirements planning is active, then an availability check is carried out against planned requirements for the material. If this assignment is not required, no check takes place.

    The type of check is proposed by the system. Each check can be switched off (but not on) by transaction in both sales and shipping.</i>

    Pl reward if fould useful...

    BR

    Sumit

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Sumit,

      Thank you for your input

      For SG 50, <b>availability check is not checked</b>

      I have read in one of the SAP material, for SG 50 <b>availability check is performed against PIRs</b> , but what I see is that there is <b>no check mark for availablity check in tcode OPPS</b> for the respective

      Due points have been assigned

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.