Skip to Content
author's profile photo Former Member
Former Member

Regarding integration with Quality mgt

how to configure the Integration points with QM & WM.

Actually after receiving the goods it will go to GR area (Here we need to do the quality and then we suppose to post concern bin).

While i am doing GR against external purchases automatically the stock will move to Quality i.e. 902 intermediate Zone and inspection lot has been generated in QM ,even through after completion of Usage decision ,the stock remain it shows 'Stock category as a Q',while TO creation.

Pls give me valuable suggestion as soon as possible.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 11:17 AM

    You have to do the PCN(posting change notice) to convert it to the available stock

    use the mvt type 321.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 01:14 PM

    Hai nag..

    Thanks for reply..actully once done usage decision by QM guy ,the posting change has been automatically updated with refference to 321 M.Type.

    It showing negative quantity...... i.e ... -100 stock category ' Q'

    positve quantity ........i.e 100 stock category 'unrestricted'

    but total PCN quanty it showing----


    -


    0

    and stock at bin level 01-01-01--


    Q-100

    At bin level warehouse stock also updaded simulteniously..bez i setup immediate TO for 321 M.Type.

    Even though stock updated ,again the stock category showing 'Q'

    while i am seeing LS26.

    Pls tell me exat procedure for integration with quality management.

    Thanks for giving reply...pls be keep in touch.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.