difference between Comsumption and reduction

Hi guru's

Is there a difference between PIR's consumption and PIR's reduction. If so, please explain. Thanks in advance.

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 02, 2007 at 04:34 PM

    PIR reduction and consumption - There is no difference.

    But the way it is used is different

    When a actual requirement like sales order is created, it consumes the PIR.

    When a create a GR, if the PIR is consumed it is called as reduced...

    Any way both cases it is going to be decreased.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 02, 2007 at 01:07 PM

    Hi,

    PIR consumption is when PIR is consumed by dependent requirement or sales order.

    PIR reduction can be through consumption or manually reduction by changing PIR figured.

    Reward point if got any help.

    Regards,

    Devang

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 02, 2007 at 07:59 AM

    Hi

    There is no difference both are same... Types of PIR consumption-

    Backword consumtion only

    Forward consumption only

    Back ward/Forward consumption

    Backword/Forward consumption

    Regards,

    Srihari

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 03, 2007 at 04:49 AM

    Hi Jag,

    There is a difference between consumption and reduction

    The consumption reduces planned independent requirements dynamically, whereas the reduction physically reduces the planning quantity and increases the withdrawal quantity accordingly.

    For example: You create a planned independent requirement with 100 pieces. This planned independent requirement is consumed against a sales order with 10 pieces. The planning quantity and withdrawal quantity remain the same (see MD63) but the planned independent requirement is displayed in the stock/requirements list (MD04) with the quantity 90. The independent requirements reduction occurs when you post the goods movement, in this case, with the goods issue for the sales order. The planning quantity of the planned independent requirement is reduced to 90 pieces and the withdrawal quantity is increased from 0 to 10 (see MD63). In the stock/requirements list, the planned independent requirement is still displayed with 90 pieces despite the reduced planning quantity because when you post the goods issue, the customer requirement against which the planned independent requirements had been consumed also disappears

    Regards

    Sunil Kumar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2007 at 07:56 PM

    Hi,

    Thank you all, i am clear now and i have awarded the points.

    thanks

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.