hi

hi,

different b/n simple job and background job?

thanks,

s.suresh.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Dec 01, 2007 at 10:49 AM

    Suresh,

    Simple Job? I am not aware of such thing.

    As far as BACKGROUND JOB is concerned a particular report or an activity can be scheduled as background both programatically or by using SM36 if a need arises that this activity should be done automatically every week or every day at so and so hour.

    BACKGROUND Jobs will not work if the program has OLE,ws_upload related functional modules.

    To schedule an activity in the background without using SM36 we can use

    JOB_OPEN,JOB_SUBMIT,JOB_CLOSE function modules.

    If any doubt revert it.

    K.Kiran.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.