Hi Experts ,

Please let me know how can i maintain the Internal batch number as well as batch number by the manufacturer.What is the configuration i need to do.

For internal batch number i have t code ...OMCZ

then i can do internal batch number assignment for assigned Goods Reciept.

In MSC1N i can Eneter Vendor and Vendor Batch number.

I would like to know if i can maintain external batch number of vendor when in am doing GR.

<b>or </b>

Do i have to create the new batch for the same material first and then receive it with internal batch number ...

Your advise will be appreciated...

Regards

Albert

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Nov 30, 2007 at 08:41 PM

    if you activate batch management for your material, then you will get an extra tab in MIGO detail. there you have a field to enter the vendors batch number.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 01, 2007 at 01:01 AM

    Hi

    If you want to assign Internal Batch no. for your Goods Receipts...then If you have activated Batch management Check box in Purchasing view of your Material master and necessary configuration settings, then Automatically Internal Batch no will be created for your GR by the system...

    If you want assign any external batch no for your GR.....then you have maintain the external Batch no in Batch Master, MSC1N and when ever you do GR in MIGO, In Item details,Batch Tab....automatically the Batch no will be propsed from the batch Master.....and from that you can assign the external Batch no for your GR...

    Or Even without maintaining batch Master also you can assign external batch no. for your GR by assigning directly the external batch no. in MIGO-- >Item Details --


    >Batch Tab.

    Reward if useful

    Regards

    S.Baskaran

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Alen Goldstein

      Hi

      Sorry for the late reply....

      In mu opinion....For your requirement External Batch no Assignment is the best option...

      Because If you assign Internal Batch no....then the system will allocate diff. batch no each time even if you receive materials from same manufacturer,Same date, same batch but at diff.times....It will be difficult for you to trace the material in future....

      If you go for External Batch no....then you can allocate according to your requirement.

      Regards

      S.Baskaran

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.