Does MRP Run takes place at plant level or at material level?

Hello

Does MRP run takes place at plant level or at material level

I am presuming it take places at plant level as in MD02 we maintain <b>plant</b>

or does it depend upon other factors like Requirements type/strategy group

thank you

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Nov 30, 2007 at 05:41 PM

    Eshwer,

    MRP takes place for a Material/Plant Combination. Net requirement calculation is based on MRP Type, Lot Size, Procurement Type etc...

    Regards,

    Prasobh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 01, 2007 at 05:23 PM

    In MD02 - it is for a material and plant combination, but BOM will get exploded and all the lower level BOm also will be planned.

    In MD01 - it is at plant level

    MD03 - it is material and plant combination.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.