Skip to Content
author's profile photo Former Member
Former Member

PRE SETP

hi gurus,

CAN ANY ONE THROW SOME LIGHT ON PRESTEP PROCESS.

where can i that one find in pricing

points rewarded for sure

kiran

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Nov 30, 2007 at 01:44 PM

    Dear Rama

    In order to reduce the XPRA runtime during an upgrade if large amounts of data have to be handled, SAP recommend that you convert the majority of the data by means of a prestep report before the upgrade. Together with the upgrade tools, this report is imported into the system during upgrade preparation (source release) and should be started as a background job before the upgrade. Converting data in prestep mode is supported as of Release 3.0 since the BAS tables were delivered as early as Release 3.0. So that the data records converted in prestep mode can be identified, they are marked with the flag for the data transfer status ( DUEFL = 'X'). The remaining data is converted during upgrade by a BAS XPRA and then also marked with this indicator.

    Thanks

    G. Lakshmipathi

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.