Skip to Content
author's profile photo Former Member
Former Member

conversion factor and batch management

Dear gurus,

1) I want to mention conversion factor in material master but when I enter it with decimal i.e. 1 meter = 1.55 tone

system is not permited the decimal

what I can I do for it.

2) I want to mention my material in batches system is accepted the batch tick in work scheduling for raw and finish material

When I am going to creat my material with semifinish It is not permited me to tick for batch manegment

Thanks!

regards

Nilesh Ithape

9922916016

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Nov 30, 2007 at 11:01 AM

    Hi

    your poits:

    1. in conversion it will not accpt decimals , it is std feature.

    in stead you have to like this:

    100 mtrs= 155tone

    2.Std system will allow batch management for semi finished materials ( HALB).

    Regards

    YMREDDY

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 02, 2007 at 06:30 AM

    what message system is giveing when you select batch management for semi-finish???///

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.