Dear gurus,
1) I want to mention conversion factor in material master but when I enter it with decimal i.e. 1 meter = 1.55 tone
system is not permited the decimal
what I can I do for it.
2) I want to mention my material in batches system is accepted the batch tick in work scheduling for raw and finish material
When I am going to creat my material with semifinish It is not permited me to tick for batch manegment
Thanks!
regards
Nilesh Ithape
9922916016
what message system is giveing when you select batch management for semi-finish???///
Add a comment