CO11N - Order and Operation status

I use co11n to confirm the operation in order. When i do final confirmation of the first operation the order header status changes to CNF whereas it should be PCNF.(operation gets the status CNF)

Ideally the order status should change to CNF only when all the operations are confirmed.

Pl let me know the reason for this behaviour of system (ECC 6.0)

Thanks

Rohit

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Posted on Nov 30, 2007 at 01:41 AM

    Hi Rohit

    This sounds like bug.

    Do you know your support package level ?

    (SAP_APPL).

    Best Regards

    Keiji

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 30, 2007 at 04:55 AM

    Hi,

    check in co11n screen before confirming whether partial confirmation

    is there.

    or else you can define in confirmation parameters whether partial confirmation

    or final confirmation or automatic confirmation depending on the qty to be confirmed.

    Regards,

    nandha

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 30, 2007 at 05:18 AM

    Hi Rohit

    Just check on OPK4 second tab " General Individual Entry ", what is the entry there, if it is final make it partial. Then check the conf status.

    Rgds,

    Umesh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 30, 2007 at 07:46 AM

    Hi All,

    Check out in this way....

    A confirmation documents the processing status of orders, operations, suboperations and individual capacities.

    You can enter a confirmation

    - For an Opeartion (co11/co11n)

    You have the following options:

    - To confirm quantities, durations, activities or personnel data.

    - To make a confirmation at a particular point in time (for example, at the start of setup or the finish of processing) enter a

    confirmation.

    - When you confirm time events, the system calculates the required duration. For example, the setup duration is the time between setup start and setup finish.

    - For an Order : CO15

    If you enter a confirmation at order header level, the system confirms all the operations that have a control key in which

    confirmation is optional or necessary. The quantitiesconfirmed in the operations are proportional to the quantities confirmed in the order header.

    Reward if useful.

    Regards,

    pherasath

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.