I have requirement. The process like Buying material from Vendor and consuming for local production order and export production order.

We are creating sales order--> Planorder ---> Production order after MRP run.

The requirment is when iam using the material for local production order i will pay to the vendor is 100 INR

When i consuming material forexport production order i will pay to the vendor is 200 INR.

How to config in SAP.

Regards,

Kumar

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Nov 30, 2007 at 03:43 AM

    Hi Ramakrishna,

    If I rephrase your scenario then its like that you have a component which is procured externally. When there is a local Order, you procure the component and at 100 INr and if its for imported 200 INR. Are you using two different material codes for Header material i.e for which Prod. Order is created.

    Anyways if your component which is procured externally at 2 diff. prices and under same material code then you can address this thru split valuation.

    Ask your MM person to do the basic config.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.