Skip to Content
author's profile photo Former Member
Former Member

DTR Migration

Currently, we are using DTR as outlined in scenario 1 for testing versioning for our projects on a development system. When are ready to move forward and productionize this scenario, how do you move the projects from the development system to new production system?

-John

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Nov 29, 2007 at 04:37 PM

    Use the more advanced scenario (track-based development).

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 29, 2007 at 11:51 PM

    Hi John,

    there are few options how to move sources between DTR worspaces in scenario 1

    option 1

    synchronize sources into <b>file system</b> from original workspace, copy as required and finally check-in into target worksapce

    option 2

    use DTR <b>command line client</b> (available with DTR installation and/or NWDS - depends on release you use)

    option 3 - the recommended before - use <b>full NWDI</b> 😊

    best regards 😊

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.