prodn order confirmation-urgent

Dear Experts

I hope u r all doing well.

We have two plants doing confirmation in co11n.

one plant want the field CLEAR OPEN RESERVATION is default so we configured for them but the second plant don't want to do like this.

In this case we can configure in OPK0 but its working both the plant so please advise me to do for only one plant nort for the second plant

thanks in advanse

with regards

s.anbu

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Nov 29, 2007 at 08:46 AM

    Hi

    There is one more configuration " Single scereen entry". In this remove this check .

    Keep this check whichever plant you want & blank for not requirted plant.

    Regards

    YMREDDY

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 29, 2007 at 12:18 PM

    Hi,

    Or you can also set that check at user level by following below given path in co11n,

    User Setting>>User Interface Setting>>Save.

    Bye for now,

    Devang

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.