yes , XI is required for EBP-SUS scneario
this is to route the incoming XML in to correct system.
three systems will be required.
1) Integration Server (XI) also called PI (Process Integration).
2) EBP ( Integration engine)
3) SUS (integration Engine).
Add a comment