Skip to Content
0
Nov 26, 2007 at 01:12 PM

configuring PR release strategy?

1289 Views

Dear SAP gurus,

I dont know what happen but it seems my PR release config is not working. We are using PR release with classification. I have done the following:

a. Create characteristic Z_PGROUP which referring to CEBAN-EKGRP (For P.Group in PR), and put the possible value

b. Create class Z_PR with class type 032 which have Z_PGROUP chars,

c. Create release group Z2 (for overall release) and assign class Z_PR

d. Create release code GA for group Z2

e. Using standard release indicator

f. Create release strategy GA (rel.group Z2), which is having rel.code GA, put the correct prerequisite, and release status, and assign the value of the class (P.Group 102), and then save it. I even simulate the release strategy and it works

g. Execute check release strategy and everything is green, I even check the assignment in CL24N and make sure the assignment is having status "1" (Released)

However when I create PR with P.Group 102, the release strategy is not picked up. Can anyone advice me of what do i miss in here?

Please help.

John.