cancel
Showing results for 
Search instead for 
Did you mean: 

PA Transfer structure for Production variances

Former Member
0 Kudos

Hi,

I am configuring PA transfer structure for production variances.

I have created 9 assignment lines for each variance category. When I try to maintain the first assignment, the system demands from me to define the group of cost elements or single cost element. The production variance category is not enough.

Which cost element or cost element group should be put there? A group of cost elements which can be posted to PP order or maybe a single cost element under which the variances are settled from PP order.

Please help me with determining - which cost elements should be used in PA variances transfer structure.

Best wishes,

Karol

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hello,

It should be group of cost elements which can be posted to PP order.