Dear cons

We have created two series of purchase requisition i.e. - ph-1, ph-2 for project. For ph-1 pur Requisition we have created WBS element. Also for ph-2 we have created separate WBS element. When we create a pur. Requisition for ph-1 if we entered WBS element of ph-2 the system is accepting which is creating a problem. Our point is that system will only accept WBS element of the respective phase. That means for ph-1 pur. requisition the system will accept only ph-1 WBS element not ph-2 WBS element. So pl. give some idea so that we can solve the issue. So where can we make the setting so that the issue can be solved.

thnks

nrp

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Nov 24, 2007 at 09:22 AM

    Hi Nirupama,

    You can control this though authorization

    Find out the authorization object for docuent type and account assignment

    And assign allowed wbs for doc type , take basis help on this

    BR

    Diwakar

    reward if useful

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.