Dear All,

What are settings for standard cost estimation is done or not for finished goods while generating sales order. If materials are not updated std. cost estimation, system should give the error message. What is the IMG setting for this scenario?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Nov 24, 2007 at 09:07 AM

    Hi

    the VPRS condition should be able to check and pick up the material cost estimate.

    Thanks

    Ashok

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.