Availability check for Alternate items

Hi PP Guys,

In the BOM alternative item group has been maintained with the parameters of Priority, Strategy "2" language probability 100%.

Alternative item group with the strategy " 2 ", it will check for full required quantity of the 1st priority item while doing availability check in the production order, if there is any stock deficit it will check for 2nd priority item for full required quality.

But the requirement is, if there is any stock deficit with the 1st priority item, then quantity available with the 1st priority item should be confirmed and the balance shortfall quantity should check with the 2nd priority item and accordingly it should confirm the requirements.

Please suggest me, is there any way to map the above requirement.

regards,

Purna

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Nov 24, 2007 at 08:36 AM

    Purna,

    This is not possible in standard SAP. SAP has provided only two options for this. The one which you explained and the other in which you define the percentage of usage probability.

    Sumeet

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.