Time taken to run MD02

Friends,

When I try executing t code MD02, it takes a very long time. I am basically not an MM guy. I need to know what could be the reason that it takes so much time.

Rock

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 23, 2007 at 11:24 AM

    Hi,

    In the planning run, if there are lot of material in the planning file entry, the system will take a lot of time to go thro' each material. If you want it fast for a single material, use MD03.

    anand

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 23, 2007 at 11:39 AM

    Hi,

    Since the t code MD02 is for single item multi level it will take some time for execution.

    thanks

    suresh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.