Skip to Content
author's profile photo Former Member
Former Member

MRP

Is there a way by which i can retrict the MRP run,(md01) for a MRP controller to one material type.ex.material type = spare parts.

Is it possible in the functional setting...or should we go for ABAP development.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Nov 23, 2007 at 06:03 AM

    Joseph,

    It is not possible in Configuration.

    You need to activate the enhancement "M61X0001" and use a user exit key value to filter the selection of materials for MRP run. Use the user exits available in the enhancement to put your code....pls go through the documentation of this enhancement for details.

    Regards,

    Prasobh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.