Skip to Content
author's profile photo Former Member
Former Member

Internal order budjeting

Hi Gurus

In my sinario, we have controlling area with controlling area currency as USD, we have given 1000 USD as a budjet for one internal orders for indian Operations used in indian company code. If At the time of giving budget the exchange rate was 35. But at the time of Posting it is 40 rupees. Now what is the relavent for budget control. Whether 1000 USD irrespective of exchange rate or 40,000 rupees.

If it is 1000 USD that is 40000 rupees on todays rate, how can i controll budget to the exchange rate given at the time of budget.

thanks in advance

padma

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 22, 2007 at 11:10 AM

    Hi

    Currency and Exch rate type maintains in the Budget Profile.

    Based on the above fields data - system considers the budget and also converts the amount into co code currency / CO area currency

    System 'll check both currencies amount while checking the budget....but the exchange rate type can be different while converting the amount (budget amount in Order and Transaction currency amount can be converted based on different ex.rate types)

    VVR

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.