Skip to Content
author's profile photo Former Member
Former Member

New Po release stratagy

hi,

I have changed the existing Po release stratagy and at the same time i have included new plant for which no rel stratagy was there. After deploying this into production server i am observing some inconsistancies in Open POs of that plant. That is for an open PO i would like to make some amendments but system is not allowing to do so. I can't un release this PO as it does not show the cancel release symbol and ME22N is also not possible as PO is already released.

Pls advise,

Your inputs are rewardable.

regds

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 22, 2007 at 10:26 AM

    Hi,

    I think while creating new release strategy you must have deleted the old strategy,it is not to do.keep the old one as it is ( imeant ot say all the release codes,release groups,strategies,just remove the values from the charectersitcs,and don't forget to keep the authorisations for the users for unreleasing old PO's)now u can unrelease the PO's and u can ammend them then it will pick the new release strategy then u can gon on for releasing nad further processing.

    please revert.

    Reward if usefull

    Regards,

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 22, 2007 at 10:13 AM

    Hi,

    What are the characteristics of your rel strat. If its a Doc specific characteristic, then you might have some inconsistencies. Just redo the strat from begining to resolve this matter.

    Anand

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 22, 2007 at 10:29 AM

    Hi BSA

    First check what release indicator u have maintained for release strategy

    If it is 1 will not able toi change PO after release.

    try to set that to 4/6 then try

    Or if u know release code and group try using ME28 where give release code and group and tick cancell release

    pls revert for any clarification

    Vishal...

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi All,

      Please tel me,what happens to fully open & partially open PO when new PO release stratagy is configured.i.e while creating PO stratagy was different now it is different.

      is there any check list to be followed while creating/changing existing PO rel stratagy?

      rewardable.

      regds

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.