on 11-22-2007 5:54 AM
Hi,
When you configure manual packaging, it doesn't appear that all the characteristics are available to use as packaging criterion. (This is to break down the planning sequence into many smaller steps for faster runtimes / smaller cursor open).
Is there a way to add these characteristics as packaging criteria? In my case with a large aggregation level with 15 characteristics, the only one available as a packaging criteria was source system, which was basically useless.
We are on SPS13 / BI 15.
Thanks , Aaron
Hi Aaron,
Did you mean to say that you don't see all the chars in UPC_BUNDLE_EXCECUTE_STEP program?
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.