manual reorder point

Former Member
0 Kudos

hello, friends,

i have define reorder point & safety stock say 500 with fixed lot size FX=1000 kg.

now i have requirement of 5000 kg & plant stock is 0.If i take MRP run then system will generate requirement of 1000 kg due to fixed lot size.

but i want total requirement of 5000(requirement)+1000(fix lotsize)kg=6000kg

please give solution for the same.

regards,

mangesh

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Fixed lot size means procurement proposal will be fixed qty.(It is not a demand requirement).As per you, it is 1000 qty. Your requirement is 5000, so this qty is splitted into multiplies of 1000. After mrp run system will create 5 planned orders each having 1000 qty.

In reorder planning, safety stock is ignored.Make sure your mrp type is PD

Reward if it useful.

Rewards,

Dharma

Former Member
0 Kudos

hello,Dharma

thanks for reply your ans help me,but i want the dep.req. qty.4000kg is club up with fixed lot size

thanks

Answers (1)

Answers (1)

former_member196398
Active Contributor
0 Kudos

Mangesh,

You need to use MRP type "V1" instead of "VB", that will work excatly as how you want in this situation.

Regards,

Prasobh

Former Member
0 Kudos

What is the diff between V1 and VB?

AA