manual reorder point

hello, friends,

i have define reorder point & safety stock say 500 with fixed lot size FX=1000 kg.

now i have requirement of 5000 kg & plant stock is 0.If i take MRP run then system will generate requirement of 1000 kg due to fixed lot size.

but i want total requirement of 5000(requirement)+1000(fix lotsize)kg=6000kg

please give solution for the same.

regards,

mangesh

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 22, 2007 at 05:48 AM

    Hi,

    Fixed lot size means procurement proposal will be fixed qty.(It is not a demand requirement).As per you, it is 1000 qty. Your requirement is 5000, so this qty is splitted into multiplies of 1000. After mrp run system will create 5 planned orders each having 1000 qty.

    In reorder planning, safety stock is ignored.Make sure your mrp type is PD

    Reward if it useful.

    Rewards,

    Dharma

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 22, 2007 at 05:56 AM

    Mangesh,

    You need to use MRP type "V1" instead of "VB", that will work excatly as how you want in this situation.

    Regards,

    Prasobh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.