Hi

After successful release of the process order, the system does not create a TR in background. It gives me the error "No WM relevant components exist (function not possible)'. The order components are WM relevant, have maintained control cycle at the plant/supply area level, PP interface is maintained at OMK0. Is there anything else I'm missing? Please help.

thanks

BE.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 21, 2007 at 06:18 AM

    Hi Brian,

    Have you maintained the setting in SPRO (CORY),That is, WM transport request to be created during the order release.If not activate this.

    Regards

    rajesh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 21, 2007 at 06:28 AM

    For the Production Schedule profiler in the plant under the Transport tab

    WM Request X Only creation of transfer requirements on release

    Use transaction OPKP to do the above.

    Add this production scheduler profiler in the Material master and also check the settings in the Order type.

    Hope this helps you.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.