cancel
Showing results for 
Search instead for 
Did you mean: 

Error - Material cost estimate with quantity structure

Former Member
0 Kudos

Hello Gurus!

Can anyone please help with the following problem:

I’m trying to do the material cost estimate with quantity structure, but the system is throwing back the message " There is no exchange rate for exchange rate type P on 1.01.2008: CHF -> EUR".

This happens because I have a subcontratation in my routing in CHF, and in transaction OB08, and I don’t had defined that rate (type P CHF –EUR).

I need to know if there is any solution to the system assumes other Type of Exchange Rate (the last real exchange rate that I have introduced in my system, not the planned!)

Points will be assigned to the suitable answer.

Thanks in advance.

Mary Jane

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member188826
Active Contributor
0 Kudos

In the valuation variant for the activity price tab you enter the version that is used for selecting the prices. In OKEQ, for the specific year & the version you maintain that 'P' is considered for forex conversion. You may either change the version, which can be configured to choose a preferred ex-rate type or change the ex-rate type for version 0.

Former Member
0 Kudos

Hi Sridhar

Thanks for your reply.

In OKEQ for the version 0, I have the rate type M.

I don't understand why the system throwing back the message " There is no exchange rate for exchange rate type P on 1.01.2008: CHF -> EUR".!

Do you know why?

Thanks and regards

Mary Jane

former_member188826
Active Contributor
0 Kudos

Does the rate for the sub-con picking up from a PIR?

Former Member
0 Kudos

Hi Sridhar

Do you mean does the rate for the sub-contract picking up from a Purchase Info Record?

No, it has picking from the material routing.

Thanks and regards

Mary Jane