Hello Gurus!
Can anyone please help with the following problem:
Im trying to do the material cost estimate with quantity structure, but the system is throwing back the message " There is no exchange rate for exchange rate type P on 1.01.2008: CHF -> EUR".
This happens because I have a subcontratation in my routing in CHF, and in transaction OB08, and I dont had defined that rate (type P CHF EUR).
I need to know if there is any solution to the system assumes other Type of Exchange Rate (the last real exchange rate that I have introduced in my system, not the planned!)
Points will be assigned to the suitable answer.
Thanks in advance.
Mary Jane