Skip to Content
author's profile photo Former Member
Former Member

REM Prod Version: How to hide/disable Storage Location fields

Hi,

We are using REM.

For Issue storage locations, we are maitaining str location in BOM/MRP2 View.

For Receving Str locatiom, we are maitaining str location in MRP2 View.

Similarly, for REM assemblies, system provides str locations fields in Production Version.

Requst to guide on following points:

1. What is the application and priority of Strorage locations in Prod Version (PV)?

2. Can the Str locations in PV be hidden/disabled?

Regards

Nitin

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 22, 2007 at 05:25 AM

    Hi NITIN,

    <b>For receiving storage location of finished goods in REM system gives priority for selecting stor loc as below.</b>

    Production version (Rec.stor.loc) -> MRP view (prod stoarge loc)

    <b>For issue storage location of components in REM system gives priority for selecting stor loc as below.</b>

    BOM (issue storage loc) --> MRP view (prod stoarge loc) -->Production version (Rec.stor.loc)

    why do u want disable the storage loc at production version.

    please close reward and close or else come back for more doubt

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Nitin,

      you are absolutely right !!. If u want the Production Version Location to fall in the priority sequence, Define ISloc="2" (only Assembly) for plant/mrp group combination, and assign MRP group to the Header material which has prod version issue loaction.

      Now the system give first priority for Prod version issue location,<b> "The above condition true only, if u have not defined issue storage loaction at BOM for components</b>"

      i hope your doubt is cleared ifso please close the thread

      regards

      pradeep

  • author's profile photo Former Member
    Former Member
    Posted on Nov 20, 2007 at 10:03 AM

    Hi Nitin,

    Please letus know what u need exactly, why do want hide the stoarge loaction at PV.

    System determines receiving storage location from MRP view and PV. For issue stoarge location system first tries to find out issue loca at BOM.

    If u want to define priority to select issue stotage location u can define at " Define Stor.Loc./Supply Area Determination in BOM Explosion"

    regards

    pradeep

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.