Question - Forecast in semifinished materials.

Hello all.

I'm having some trouble with forecast in a semifinished material.

I have the consumption values in the material, have executed forecast and copy the results to demand management. The requirement is VSF. When i run the MRP the system calculates the requirements for the the forecast, ex: 1500 UN per week.

If I have a SO to the finish product with quantity of 500 UN the system will calculate the requirements 2000 UN. I want the system to make 1000 UN for the forecast because the other 500 UN is for the sales order.

Can someone help me please?

Thanks in advance.

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 20, 2007 at 08:38 AM

    Hi

    there is a field "MRP dep.requirements" in MRP 4 field.

    you play with this field for semi sinished material.

    Try one of the option.

    Regards

    YMREDDY

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hello. Thanks for reply.

      In the semifinished I used "1" in MRP Dep. Requirements in MRP 4, that means "Materials for dependent requirements are not planned". This is no good because if I have a SO for the finish product bigger than the forecast, the system ignores it.

  • author's profile photo Former Member
    Former Member
    Posted on Nov 20, 2007 at 04:39 PM

    Hi,

    Forecast (PIR) 1500 UN

    Sales order 500 UN

    Requirement type VSF

    Your statement is system creating 2000 UN.

    But as per requirement type VSF,sales order will consume the PIR. So your forecast unit will reduce to 1000 UN.

    In req type BSF only sales order will create another 500 requirement.

    Check your settings in mrp 3 view strategy 40. And also make sure your requirement type VSF & for customer requirement type KSV.

    Reward points if it is useful.

    Regards,

    Dharma

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 21, 2007 at 08:26 PM

    In MRP3 view

    Please check then following

    Stg group = 40

    Consumption mode = 2

    forward consumption period = 30 days(atleast)

    Backword consumption = 30 days(atleast)

    MixedMRP = 1

    In MD63

    in item tab page

    CL field value = 1

    Is the above settings are there are not?

    please check and come back.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.