Skip to Content
author's profile photo Former Member
Former Member

Is it possible to set lead time with reference to Inco term

Is it possible to set lead time with reference to Inco term.I want to capture transit time in combination of Vendor & Material with reference to Inco term. Any other provision except the field of Plnd delivery time of Info record & GR processing time of Material Master.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Nov 20, 2007 at 05:22 AM

    Hi,

    Your planned dely time should consider this.I think not possible.

    Thanks

    suresh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.