Former Member
0 Kudos

Hi frds,

During the MRP run I want to exclude the blocked stock and stock in Quality for the material for which I execute the MRP ( parent material and not components).

Kindly guide how and where should I do the settings??

Regards,

Rajnish

Accepted Solutions (0)

Answers (3)

Answers (3)

mohan_madaiah
Active Participant
0 Kudos

Hi rajesh,

For your Scenario go to MMSC for the particular material and Keep 1 as MRP indicator for those storage loc which are not to be considered for MRP.

your problem will be solved reward points

rajasekhar

Former Member
0 Kudos

Hi Frds,

I am still waiting for te inputs from u. My client wants the stock in quality

should not be considered for MRP. Here I am talking about the

parent material for which MRP is run and not the conponents.

Rajnish

Former Member
0 Kudos

Hi,

In OPJJ, you can exclude blocked stock,Quality Inspection stock,Safety stock & stock in transfer.

Regards,

Dharma

Former Member
0 Kudos

Hi Rajnish,

goto OPPJ and intick the "incl. Blocked stock"

This will solve your problem.

Sumeet

Former Member
0 Kudos

Sumeet,

Thanks for the reply. Solved my problem of blocked stock. What about the

stocks that are in quality??

Rajnish