Skip to Content
author's profile photo Former Member
Former Member

forecasting with mrp areas

Hi All

I have a generic/common doubt in forecasting with mrp araes (consumption based plng with mrp typr v2). The material is allocated an mrp area of type 2(storgae location ) and in the forecasting tab of the mrp area i do not see any " execute forecast", "total consumption" or "forecast values" button that u normally see in forecasting tab in material master at the plant level. if i go to the mrp areas i find four tabs "<i>mrp 1, mrp 2, forecast and consumption values</i>". is this standard setting. Bcos of this iam not able to see the forecast results in graphic at the mrp arae level, nor i can change the forecast values or execute forecast at mrp area level in material master record.

Regards

Sam

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Nov 19, 2007 at 11:44 PM

    Hi Sam,

    I think you should post your query SAP ERP - Logistics Materials Management (SAP MM)

    Regards,

    Atish

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.