Skip to Content
author's profile photo Former Member
Former Member

Planning DATE keyfigures

Hi all,

Is it possible to plan DATE keyfigures?, I need to plan some dates every month when we evaluate a cashflow forecast using this dates. The dates are such as Final Project, Initial Works date, Initial Sales Period, etc. (They don't come from PS R/3 module, we prefer they plan this dates in IP system)

The problem is that when I create the date keyfigure I can't enter planning data, the system says that there is a MAX aggregation but I'm using a unique record selection.

If this is not possible I'm thinking on use an Integer keyfigure that acts as an offset from an starting date that can be an attribute of the main characteristic (0PROJECT). In this scenario I will plan just the offsets from this date, but then the problem will be how to define a Variable that gets the date from a calculation obtaining the diference between one variable (type 0CALDAY) and the offset obtained from he infocube.

I hope to be understood, it's a little complex to explain.

Best regards,

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    Posted on Nov 19, 2007 at 12:38 PM

    You should use keyfigures of type DEC, not DATS.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.