My client has a requirement of recording MP/counter reading for future time at least 1 day in advance via measurement document. At present if I am trying to record reading for future time I am getting the attached error as it comes with standard settings. I want to pass this check and allow system to accept readings for future time. Can anyone please suggest how to achieve this via some enhancement or some user exit.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Nimish,
A measurement document could be a reading or qualitative valuation of a technical object in real time. Recording a reading for future is not recommended so it's not available as a standard in SAP.
Please provide more detail about the requirement we can discuss for work around if any. Thanks
Regards
Varun M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Pete my client has this requirement because due to some maintenance activities at plant the readings will automatically deviate from actual reading & that's acceptable. So for this purpose he want to record readings against measuring point via measurement document for at least 1 day in advance. I am using a Z tcode and uploading readings via excel sheet. I hope now you will understand the requirement.
Anyways I have found the solution, it can be done via standard configuration settings - we just have to define tolerance limits in seconds at Define measurement point categories path in SPRO
Nimish,
This seems a strange requirement - why do you want to do this?
PeteA
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Pete my client has this requirement because due to some maintenance activities at plant the readings will automatically deviate from actual reading & that's acceptable. So for this purpose he want to record readings against measuring point via measurement document for at least 1 day in advance. I am using a Z tcode and uploading readings via excel sheet. I hope now you will understand the requirement.
Anyways I have found the solution, it can be done via standard configuration settings - we just have to define tolerance limits in seconds at Define measurement point categories path in SPRO
Hi Nimish
As per my knowledge not possible in IK01, just try with collective entry list.
Thanks
PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
8 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.